Gold project economics: grade, strip ratio and all-in costs

How to read a gold project's numbers: grade, recovery, strip ratio, all-in sustaining cost, the gold price assumption and the sensitivities that decide the case.

6 min read

A gold project’s study ends in a few headline figures: ounces produced a year, cost per ounce, capital cost, net present value. They’re the output of a chain of assumptions, and each link can be checked. Reading the chain is more useful than reading the headline.

The basic arithmetic is short. Ore mined, times grade, times recovery, gives the gold sold. The gold sold, times the price, less the cost of mining, processing, the state’s take and the capital, gives the cash the project makes. Everything else is detail on those terms.

Grade and recovery

Grade is the amount of gold in each tonne of ore, in grams per tonne (g/t). One troy ounce is 31.1 grams. Take a deposit at 1 g/t as an example: each tonne holds 1 gram of gold, and if the plant recovers 90%, it yields 0.9 grams, a little under three hundredths of an ounce. To produce 100,000 ounces a year at that grade and recovery, the mine has to feed the plant about 3.5 million tonnes of ore.

That’s why grade matters so much. Halve the grade and the mine has to move and process twice the ore for the same gold, with roughly twice the cost. Open-pit mines can work at grades around 1 g/t or below because they move rock cheaply in bulk. Underground mines cost much more per tonne and usually need several grams per tonne.

The grade in the study is the diluted grade fed to the plant, after waste rock mixed in during mining and ore lost at the edges. It’s usually lower than the resource grade. Check that the study shows both and explains the difference.

Recovery comes from metallurgical testwork, and it can vary by ore type and depth. The article on gold processing methods explains why oxide and sulphide ore from the same deposit can behave very differently.

Strip ratio

In an open pit, the strip ratio is the tonnes of waste rock moved for each tonne of ore. A ratio of 5 means five tonnes of waste for every tonne of ore. Moving waste is a large part of mining cost, so the strip ratio and the cost per tonne moved together set much of the mining bill.

Strip ratios usually rise as the pit deepens, because the walls have to be cut back further to stay stable. A study that shows a low average ratio may hide a much higher one in later years. Ask for the ratio by year, not only the life-of-mine average. In Kalimantan’s wet climate, pit slopes in weathered rock may need to be flatter, which adds waste.

Cut-off grade

The cut-off grade is the grade below which material is treated as waste rather than ore. It depends on the gold price, recovery and the cost of processing and selling. A higher assumed gold price lowers the cut-off and turns more material into ore, which raises the reserve and lowers the average grade.

When you compare a resource or reserve with an older report, check the gold price and cut-off behind each. A bigger reserve may reflect a higher price assumption rather than more drilling. The article on gold resources and reporting covers how those categories work.

Cost per ounce

The industry quotes costs per ounce of gold sold. Cash cost covers mining, processing and site administration. It leaves out much of what a mine really spends.

All-in sustaining cost (AISC) is the measure the World Gold Council set out in 2013 to make miners’ figures comparable. It adds to the site costs the royalties and production taxes, the capital needed to keep the mine running at its current level, sustaining exploration, the reclamation cost of current operations and a share of corporate overheads. It leaves out income tax, the capital for new projects or expansions, and financing costs.

So AISC answers a narrow question: what does it cost to keep producing an ounce at this mine as it stands? It doesn’t cover the cost of building the mine. For a new project, add the initial capital, spread over the ounces the mine is expected to produce, to get a fairer picture of what each ounce has really cost.

Compare AISC with the gold price you think likely, not the price on the day. The gap between them, after tax, is what pays back the capital.

The state’s take

In Indonesia the state’s share comes through royalty, land rent, corporate income tax, VAT and regional taxes, and for some licence types a share of profit. Gold royalty rates are set by government regulation and, as of 2026, they move with the gold price. The article on gold royalties and taxes sets out the current schedule. Check that the study uses the rates in force now, not those from when the study was written.

Reclamation and closure guarantees, community development spending and the cost of dealing with unlicensed miners on the area are real costs too. A study that leaves them out flatters the result.

Price and sensitivity

Gold reached record prices in 2025. A study written in a period of high prices can look strong at today’s price and weak at a lower one. The gold price used in the base case is a choice, and it should be stated and defended.

Most studies show the net present value at a chosen discount rate, the internal rate of return and the payback period. Look past those to the sensitivity tables, which show how the result changes when price, grade, recovery, operating cost and capital cost each move up or down. The variables that move the result most are the ones to check hardest. For most gold projects that’s price and grade, followed by recovery and capital cost.

Capital cost estimates have their own accuracy, which depends on the study stage. A scoping study’s estimate is rough. A feasibility study’s is tighter, but new mines still often come in over budget, and remote sites carry extra risk on logistics, power and construction. The article on gold exploration stages explains what each study level can support.

Reading a study

Work through a project’s numbers in this order:

  • Check the reserve and resource categories, and how much of the mine plan rests on inferred material.
  • Find the diluted head grade and recovery for each year, by ore type, and compare them with the testwork.
  • Look at the strip ratio by year and the cost per tonne moved.
  • Read the AISC breakdown and see what’s included. Add initial capital per ounce yourself.
  • Note the gold price, discount rate and royalty rates assumed, and rerun the case at a lower price.
  • Read the sensitivity tables before the headline figures.

If the numbers depend on one optimistic assumption, structure the deal to share that risk. Staged payments or payments tied to production, discussed in gold project partnerships, do that better than a single price paid up front.

General information, not legal, tax or investment advice. Rules change, so confirm the current regulation with a notary or lawyer before you act.