Selling a palm oil mill's surplus power to PLN
How palm oil mills generate their own electricity, when they can sell the surplus to the state utility PLN, and why grid access in rural Kalimantan decides it.
5 min read
A palm oil mill is a small power station. It burns the fibre and shells left over from the fruit to raise steam, uses the steam to drive a turbine and to cook the fruit, and usually needs no grid power at all. Add a biogas plant on the mill’s effluent pond and it can make more electricity than it uses.
The question is what to do with the surplus. In Indonesia the usual answer is to sell it to the state electricity company, Perusahaan Listrik Negara (PLN). Whether that works depends on the contract, the licence and, above all, how far the mill is from a power line.
Where a mill’s power comes from
A mill has two sources of energy on site.
- Boiler fuel. Pressed fibre and shells come out of the process every hour the mill runs. Burned in the boiler, they make steam for sterilising the fruit and for a back-pressure turbine that runs the mill’s machines. Most mills have just enough for their own needs, with shells left over to sell.
- Biogas from effluent. Palm oil mill effluent (POME) gives off methane as it breaks down in open ponds. Covering a pond or building a digester captures the gas, which can fuel a gas engine. Biogas from mill effluent explains the technology.
The boiler and turbine only run while the mill processes fruit, which may be 20 hours a day in the peak months and much less in the low ones. Biogas is steadier, because the digester keeps producing gas for some time after processing stops and the gas can be stored for hours. That’s why most grid export projects at mills are built on biogas, often with a capacity of one to a few megawatts at a mid-sized mill. The real figure depends on the mill’s throughput and the design, so ask for measured gas flows, not a brochure number.
Some mills also burn empty fruit bunches or buy in extra biomass to run a larger turbine. That raises fuel costs and adds a supply chain, covered in empty fruit bunches and biomass.
Who buys the power
PLN owns the transmission and distribution grid across Kalimantan and, in most places, is the only buyer allowed to take power from an independent generator. There are two common ways a mill sells to it.
A full power purchase agreement (PPA) treats the mill’s plant as an independent power producer. The plant commits to deliver a certain capacity, and PLN commits to buy it for a long term at an agreed tariff. This needs a licence to supply electricity for public use, a full procurement process with PLN, and the paperwork of any power project.
An excess power arrangement is lighter. The plant exists mainly to serve the mill, and PLN agrees to take whatever is left over, usually with less firm commitments on either side. Tariffs are often lower and the contract shorter. Indonesian rules allow a plant built for its owner’s own use to sell surplus to the area’s utility, with the right approvals. Which licence applies, and whether a captive plant needs one at all at its size, is a question for an adviser before any equipment is ordered.
As of 2026, PLN’s purchase prices for renewable power, biomass and biogas included, are framed by Presidential Regulation 112 of 2022. It sets ceiling prices that vary by technology, size and location, with higher ceilings in regions where generation costs more. The regulation was meant to speed up renewable projects, but the ceiling isn’t the price. PLN negotiates below it, and its own supply plan decides whether it wants new capacity in that area at all. Ask an adviser for the current rules and for any changes since 2022.
Grid access is the real test
Many Kalimantan estates sit far from PLN’s medium voltage lines. A mill 30 kilometres from the nearest line has to fund that connection, and the cost of the line, the substation equipment and the right of way can sink a small project.
The situation varies by province. PLN has been linking the provincial grids into one Kalimantan system and extending lines into the interior, and it runs a programme to replace small isolated diesel stations in remote villages. A mill near one of those diesel stations may be welcome as a cheaper local source. A mill on a weak line, where the grid can’t absorb a few megawatts, may be told to wait.
Before any study, ask PLN’s regional office (Unit Induk Wilayah) whether the local system needs power and whether the nearest line can take it. PLN’s electricity supply business plan (Rencana Usaha Penyediaan Tenaga Listrik, RUPTL) shows where it plans new capacity. A project outside that plan is much harder to sign.
What can go wrong
- Fuel follows the mill. If fruit supply falls, the mill closes for maintenance or the estate replants, gas and fibre fall too. A PPA with a firm capacity commitment can then turn into penalties.
- PLN curtails. On a small grid, PLN may cut back purchases at times of low demand, and excess power contracts often allow that without compensation.
- Payment and currency. Tariffs are paid in rupiah, while equipment is usually bought in dollars or euros. See moving money in and out for the currency rules.
- Engine and digester upkeep. Biogas contains hydrogen sulphide, which corrodes engines unless it’s scrubbed out. A neglected scrubber shortens an engine’s life quickly.
- Rule changes. Tariff rules, local content requirements and licensing have all changed several times in the past decade.
Emission credits from captured methane can add income, but they come with their own verification and market risk. The carbon market in Indonesia article explains how those credits are handled.
What to check first
- The mill’s throughput by month for at least three years, and the fruit supply behind it.
- Measured biogas output or effluent volumes, not design figures.
- The distance to PLN’s nearest line, its voltage and whether PLN says it can take the power.
- Whether the area appears in PLN’s current business plan, and what the regional office says about demand.
- The licence the plant needs, the draft contract’s terms on curtailment, penalties and tariff, and who pays for the connection.
- The mill’s environmental approval, since changing how effluent is treated may require it to be amended.
A mill that already uses its biogas to replace diesel in its own operations may get better value from that than from the grid. Compare the two before assuming that selling to PLN is the better use.
General information, not legal, tax or investment advice. Rules change, so confirm the current regulation with a notary or lawyer before you act.