Biomass co-firing in coal power plants: what sellers should know
How PLN's co-firing programme buys biomass for its coal plants, what the gap between plan and supply means for sellers, and the fuels that suit Kalimantan.
5 min read
Co-firing means burning biomass together with coal in an existing coal-fired power plant. The plant keeps its boiler and its coal, and replaces a small share of the coal with something renewable. For a palm mill or a wood processor in Kalimantan, such a plant is a possible buyer that already exists, with the boiler already built.
The state utility PLN runs Indonesia’s co-firing programme. This article looks at what the programme has bought so far, what it needs and what a seller has to be ready for.
The programme and its gap
PLN set out to co-fire at 52 of its coal plants, with a combined capacity of 18,895 MW. At the share it aimed for, it put its biomass need at about 10.2 million tonnes a year.
Actual supply has been far below that, according to reports in the Indonesian press:
- about 1 million tonnes in 2023
- 1.62 million tonnes in 2024
- about 2.35 million tonnes in 2025
- 460,368 tonnes in the first quarter of 2026
PLN’s fuel procurement arm, PLN Energi Primer Indonesia (PLN EPI), has set supply targets of 3.65 million tonnes for 2026 and 4.07 million tonnes for 2027. Those targets are well under the 10.2 million tonnes of the original plan.
The gap tells a seller two things. There is room for much more supply. And the bottleneck has been getting reliable biomass to the plants, not the plants’ wish to use it. A seller who can deliver steady volume at the right quality is in a better position than the headline numbers suggest. But the same numbers show that buying has grown slowly.
Which fuels are used
Co-firing plants have taken several kinds of biomass:
- Palm kernel shells. PLTU Ketapang and PLTU Sanggau in West Kalimantan began commercial co-firing with shells in December 2020, according to the energy ministry. See palm kernel shells.
- Wood chips and wood pellets. At PLTU Pulang Pisau in Central Kalimantan, the plant has used wood chips from plantation waste collected from people around it, and PLN has planted gamal (a fast-growing tree) as a feedstock.
- Pellets from empty fruit bunches. A local company signed an agreement with PLN in West Kalimantan to supply pellets made from bunches. See empty fruit bunches and biomass.
- Sawdust and other wood residues, from local sawmills.
Which fuel suits a plant depends on its boiler. A plant is set up to take a certain size, moisture and ash content. Raw empty fruit bunches are wet and bulky, so most plants need them pressed, dried or turned into pellets first.
What a plant looks for
PLN buys through its procurement arm, under contracts that name the specification. The details differ by plant, but the points are the same:
- heating value, moisture and ash content, measured by an agreed laboratory
- size and form (chips, shells or pellets), so the plant’s feeders can handle it
- steady monthly volume, with a penalty or a replacement duty if a delivery fails
- delivery to the plant’s site, by road or river, with weighing at the gate
- proof of where the biomass came from
The last point matters more each year. Shells and pellets that come from land inside a forest area, or from a plantation without legal status, are a risk for the buyer. Forest area status explains the check, and bioenergy certification covers the schemes buyers ask for.
Where the money is, and isn’t
Biomass for co-firing is a commodity. The seller’s margin depends on what the fuel costs to collect, dry, shape and move, against a price set in a contract with a large state buyer. This is not a high-margin business, and in Kalimantan the biggest cost is often transport. A plant on the coast or on a navigable river is easier to reach than one far inland.
That is why a mill’s own by-products are the cheapest source. A mill that already has shells and fibre on site avoids most of the collection cost. A project that has to buy biomass from many small suppliers carries a higher cost and a weaker supply chain.
Three questions help to screen a project:
- Which plant will buy, within what distance, and has its specification been checked against the product?
- Is there a signed contract, or only a letter of interest? Programme targets have run ahead of purchases before.
- Who supplies the raw material, and can it deliver every month of the year, including the wet season, when roads and rivers slow down?
Risks to price in
- Volume risk. A plant may take less than planned, because its coal supply, its boiler or its dispatch changed.
- Policy risk. The programme depends on government targets, and targets have been revised before. Indonesia has also at times discussed holding biomass back for domestic plants, as noted in the shells article.
- Quality risk. A rejected delivery is a lost delivery, and moisture creeps up in storage.
- Payment terms. Ask how long PLN’s contracts take to pay and what the penalties are.
A seller with an export option, such as shells to Japan or Korea, can use it as a fallback if the domestic buyer slows down. Compare the two before committing a plant’s output to either.
Where this leaves an investor
Co-firing is a real and growing buyer of biomass in Kalimantan, with a state counterparty. It’s also a slower and smaller market than the plan implied. A project that depends on it should be sized to the supply that is actually contracted, not to the programme’s headline target.
General information, not legal, tax or investment advice. Rules change, so confirm the current regulation with a notary or lawyer before you act.